Low-Voltage Power Distribution for 24/7 Parcel Sorting Centers

CHINT supplied low-voltage switching and protection equipment for SPX Express's Hung Yen sorting center, where panel builder SEAE integrated more than 1,450 devices.

  www.chintglobal.com
Low-Voltage Power Distribution for 24/7 Parcel Sorting Centers

Application areas: Low-voltage power distribution, motor control and reactive power compensation for automated parcel sorting and conveyor systems
Industry sectors: 
logistics, express parcel delivery and electrical infrastructure.


In a sorting center designed for 24/7 operation, a conveyor stoppage or distribution fault can interrupt parcel flow, with the impact depending on the affected equipment and the line layout. Power distribution therefore becomes part of operational planning from the outset. At the SPX Express Sorting Center in Hung Yen, Vietnam, automated sorting systems, conveyors and other operational areas place different demands on the electrical infrastructure, which project teams must translate into equipment specifications and a coordinated distribution design.

Technical requirements of the sorting center
The project involved coordinating more than 1,450 devices across multiple functional zones, with breaking capacities of up to 100 kA alongside the demands of continuous automated operation. These two requirements address different issues: breaking capacity defines the fault current a device can safely interrupt, while continuous operation describes the facility's duty. A high breaking-capacity rating therefore does not by itself guarantee uninterrupted service.

Distribution architecture and division of responsibilities
Panel builder SEAE designed, assembled and integrated the complete distribution system, covering generator and transformer connections, main distribution boards, motor control centers and capacitor banks. CHINT supplied the low-voltage equipment and the associated switching and protection solutions. Main distribution feeds the different areas of the facility, downstream circuits serve individual loads, motor circuits require switching and protection suited to their operating conditions, and capacitor banks provide reactive power compensation.

CHINT's supply included air circuit breakers, molded case circuit breakers, miniature circuit breakers and residual-current protection devices, as well as contactors and overload relays. Circuit breakers protect circuits, contactors switch loads and overload relays protect motors against overload; their selection and application depended on circuit requirements and SEAE's system design.

Delivery and local support
Equipment selection also had to reflect the construction schedule, and CHINT's local presence in Vietnam helped coordinate product supply, technical support and services with project progress. In a comparable delivery case in Cambodia, CHINT worked with SNTT on component procurement while PATech assembled and tested a 5000 A main switchboard, completing procurement, assembly, testing and delivery within ten weeks. For Malaysia's MRT Corp, CHINT supplied standardized low-voltage solutions using modular, pre-qualified components to support network expansion, an approach also relevant to logistics facilities that plan additional lines and loads.

Planning considerations for logistics facilities
Before procurement, project teams should identify which sorting or conveyor loads would disrupt wider operations if interrupted, in order to define continuity requirements and circuits needing closer engineering review. Motor-starting requirements and expected simultaneous demand across zones inform supply and protection decisions. Maintenance planning should cover access and isolation arrangements, while planned expansion requires switchboards to be assessed for both electrical capacity and physical space. No quantified operating results were published; the benefits lie in coordinated protection, defined fault-interruption capability and equipment delivery aligned with the construction schedule.

Edited by Sucithra Mani, Induportals editor – adapted by AI.